[an error occurred while processing this directive]
        [page auto-refreshes after 300 sec]   [stop | on]            [press Ctrl+Shift+R to enforce refresh of scores, dates and news]
Workflow information system for QC  
Last update: 2025-11-01T15:50:50 (UT)
  | now: 2025-11-02T08:58:33 (UT)  
png: Information and research:
- png file - advanced studies: QC1 browser | QC1 plotter
Plot
?
Symb
?
Source
*
Average ? Thresholds ? N_
data
QC1
parameter
Data
downloads
Remarks
method value unit method value
1 QC1DB MEAN 1.06e+04 number none  160 N_AB_EXE all (full time range) VIRCAM (mef=16)
1. number of all executed det.ABs per month (after 2011-10: CALIB)
2 QC1DB MEAN 108 hours none  160 T_AB_EXE all (full time range) 2. total AB processing time per month (hours)
4 QC1DB MEAN 132 hours none  159 T_QC_EXE all (full time range) 3. total QC report execution time per month (hours)
*Data sources: QC1DB: QC1 database; LOCAL: local data source
Plot 1
data source:monthly_stat
(QC1 database)
dataset:N_AB_EXE
mean:1.06e+04number
thresholds:none 
N_data plotted:160
[click plot for closeup]
Plot 2
data source:monthly_stat
(QC1 database)
dataset:T_AB_EXE
mean:108hours
thresholds:none 
N_data plotted:160
[click plot for closeup]
Plot 4
data source:monthly_stat
(QC1 database)
dataset:T_QC_EXE
mean:132hours
thresholds:none 
N_data plotted:159
[click plot for closeup]
This plot

This plot visualizes the monthly statistics of executed detector ABs ('det.ABs'):
- number of all successfully processed ABs
(before XXLight: successful CAL+SCI; with XXLight: successful CAL only),
- total execution time for ABs in hours (pipeline processing),
- total QC report execution time in hours.

The significant drop in execution times in 2013-04 is caused by the migration to the muc machines, with a significant gain in compute performance.

The det.AB number refers to jobs per detector and is higher by a factor MEF_FACTOR than the actual number of ABs as counted in the QC system and displayed in the AB certification plot. For reference, MEF_FACTOR=4 for CRIRES and HAWKI; 16 for VIRCAM; 32 for OCAM; 3 for KMOS; 24 for MUSE. This number measures the compute workload.

The numbers for AB_texec and QC_texec are the sum of execution times for all processed ABs (including the failed ones), without further correction for MEF_FACTOR.

Note: The latest data point in the current plot usually refers to a month which is not yet finished. Its value will therefore continue to increase until a new last month starts.  


General information

Click on any of the plots to see a close-up version.

The latest date is indicated on top of the plot.

If configured,

  • data points belonging to the latest date are specially marked
  • statistical averages are indicated by a solid line, and thresholds by broken lines
  • outliers are marked by a red asterisk. They are defined as data points outside the threshold lines
  • "aliens" (= data points outside the plot Y limits) are marked by a red arrow ( or )
  • you can download the data for each parameter set if the 'Data downloads' link shows up