This plot visualizes the monthly statistics of executed detector ABs ('det.ABs'):
- number of all successfully processed ABs
(before XXLight: successful CAL+SCI; with XXLight: successful CAL only),
- total execution time for ABs in hours (pipeline processing),
- total QC report execution time in hours.

The significant drop in execution times in 2013-04 is caused by the migration to the muc machines, with a significant gain in compute performance.

If applicable we have added metrics for IDPs. The initial peak refers to the (re)processing of the entire historical batch.

The det.AB number refers to jobs per detector and is higher by a factor MEF_FACTOR than the actual number of ABs as counted in the QC system and displayed in the AB certification plot. For reference, MEF_FACTOR=4 for CRIRES and HAWKI; 16 for VIRCAM; 32 for OCAM; 3 for KMOS; 24 for MUSE. This number measures the compute workload.

The numbers for AB_texec and QC_texec are the sum of execution times for all processed ABs (including the failed ones), without further correction for MEF_FACTOR.

Note: The latest data point in the current plot usually refers to a month which is not yet finished. Its value will therefore continue to increase until a new last month starts.