Next:
Introduction
Up:
No Title
Previous:
No Title
Contents
Introduction
Scope
Applicable Documents
Reference Documents
Abbreviations and Acronyms
Overview
Data Flow Structure
Proposal and Observation Handling
VLT Control system
Science Archive
Pipeline Processing
Quality Control
Domain Objects and Utilities
Database Services
Responsibilities for a VLT/VLTI Instrument
Construction period
Instrument Responsible
Instrument Control Responsible
Data Analysis Specialist
Instrument Consortium
Data Flow Instrument Responsible
Data Flow Products Summary
Instrument installation and commissioning period
Performance Evaluation
Provisional Acceptance
Running-in period
Routine Operations
Instrument Scientist
User Support
Paranal Observing
Paranal Instrument Maintenance
Data Flow Instrument Responsible
Archive Group
Upgrade phases
Documentation
Data Flow User Requirements
Data Flow Software Requirements
Data Reduction Detailed Design
Calibration Plan
Data Flow User Manual
Software Development
VLT instrumentation plan
Software development plan
Instrument calibration packages
Development environments
About this document ...
ESO local web document owner
Thu Feb 20 18:11:39 MET 1997