next up previous contents
Next: Construction period Up: No Title Previous: Database Services

Responsibilities for a VLT/VLTI Instrument

 

This Section summarizes responsibilities for the main deliverables provided by the parties involved in interfacing the Data Flow system to a given instrument. Context and deliverables are described in the next sections. The VLT control software is not considered in this Section and is described in the documents [12] and [13].





ESO local web document owner
Thu Feb 20 18:11:39 MET 1997