The instrument control responsible prepares or supervises the preparation of the Phase II template GUIs, maintenance and engineering script. In general, s/he prepares the Sequencer, translating templates into observing software (OS) instructions, and performing a detailed validation of OBs during Phase II (see [5], [12], [13]). If this part of the realisation is contracted out, the instrument control responsible follows the consortium or sub-contractor for this aspect of the software development (see Section 4.1.4).
In addition, this person will prepare the documentation associated to Phase II, maintenance and engineering scripts. The instrument control responsible is answerable to the instrument responsible.
S/he implements: