Data Flow Products Summary

The following tables summarize the software and data products necessary to build the Data Flow system for each instrument. It is assumed that the Data Flow system infrastructure software exists (generic Phase II software, pipeline, instrument models) and is identical for all VLT instruments. The responsibilities, associated documentation and development plan will be detailed in the next Sections. It must be noted that although the persons involved may belong to different divisions, they work in this context in a single work package under the responsibility of the Instrument Responsible. The tables list the person producing the different components of the instrument specific parts of the Data Flow. The responsibility for these products is, for the documents with the author and approvers of the document, for the software products with the developer and its group leader. All data products are under the responsibility of the instrument scientist.

Documents cm
Number Product Name Dependencies Produced Remarks
by
1 User Requirements IR
2 Software Requirements 1 IR
3 Calibration Plan 1 IR
4 Data Reduction Det. Des. 2 DAS
5 Data Flow User Manual 7,8,9,11,12 DFIR For pipeline modes

Software Products cm
Number Product Name Dependencies Produced Remarks
by
6 Reduction Algorithms 4 DAS For all modes
7 Reduction Recipes 4 DAS For pipeline modes
8 P2PP files and GUIs 15 ICR
9 Exposure Time Calculator 2 DAS
10 Imaging Simulation 2 DAS Optional
11 Maintenance Procedures 3 ICR
12 Engineering Procedures 3 ICR

Data Products cm
Number Product Name Dependencies Produced Remarks
by
13 Header Data Dictionary IR
14 Instrument Sample Data IR
15 Template and P2PP files 4 ICR
16 Recipes Validation Set 5 IR
17 ETC validation set 2 IR
18 Physical data 3 IR
19 Instrument model 2 DAS
20 Calibration Data 3 DFIR For pipeline modes
21 Classification Rules 3 DAS
22 Reduction Rules 3 DAS
23 Quality Control Rules 3 DAS
24 Calibration Rules 3 DAS
25 Reduction Recipes 3 DAS
26 Technical Programs 3 IR
27 Scheduling Parameters 3 IR