Panorama of the Road to Amazones
Panorama of the Road to Amazones
On the Road to Armazones
On the Road to Armazones
E-ELT site testing — Vizcachas / Chile
E-ELT site testing — Vizcachas / Chile
The European Extremely Large Telescope
The European Extremely Large Telescope
The E-ELT (artist's impression)
The E-ELT (artist's impression)
E-ELT and VLT vs St.Stephan's cathedral
E-ELT and VLT vs St.Stephan's cathedral
E-ELT and VLT vs Brandenburger Tor
E-ELT and VLT vs Brandenburger Tor
E-ELT and VLT vs Atomium
E-ELT and VLT vs Atomium
A Flat Armazones
A Flat Armazones
Blast product
Blast product
Bulldozer at work
Bulldozer at work
E-ELT and VLT vs Colosseum
E-ELT and VLT vs Colosseum
Close to Armazones
Close to Armazones
Wavefront sensors
Wavefront sensors
E-ELT M5 support system being tested
E-ELT M5 support system being tested
Cerro Armazones at night
Cerro Armazones at night
Cerro Armazones at night
Cerro Armazones at night
E-ELT site testing - Cerro Macon / Argentina
E-ELT site testing - Cerro Macon / Argentina
The E-ELT Enclosure Inside
The E-ELT Enclosure Inside
The E-ELT
The E-ELT
E-ELT and VLT vs Sydney Opera
E-ELT and VLT vs Sydney Opera
E-ELT and VLT vs Pisa Tower
E-ELT and VLT vs Pisa Tower
E-ELT and VLT vs Statue of Liberty
E-ELT and VLT vs Statue of Liberty
E-ELT and VLT vs Sagrada Familia
E-ELT and VLT vs Sagrada Familia
Map of the road to Cerro Armazones
Map of the road to Cerro Armazones
Prototype of part of the adaptive support system of the E-ELT
Prototype of part of the adaptive support system of the E-ELT
Full-sized E-ELT mirror mock-up
Full-sized E-ELT mirror mock-up
VLT Site Testing
VLT Site Testing
E-ELT possible site — Cerro Tolonchar / Chile
E-ELT possible site — Cerro Tolonchar / Chile
E-ELT edge-sensor testbed
E-ELT edge-sensor testbed
The Active Phasing Experiment (APE) installed on the VLT
The Active Phasing Experiment (APE) installed on the VLT
Components of the Active Phasing Experiment (APE)
Components of the Active Phasing Experiment (APE)
Components of the Active Phasing Experiment (APE)
Components of the Active Phasing Experiment (APE)
Components of the Active Phasing Experiment (APE)
Components of the Active Phasing Experiment (APE)
E-ELT edge-sensor testbed
E-ELT edge-sensor testbed
E-ELT edge-sensor testbed
E-ELT edge-sensor testbed
The E-ELT Primary Mirror
The E-ELT Primary Mirror
VLT Site Testing
VLT Site Testing
Paranal from Cerro Ventarrones
Paranal from Cerro Ventarrones
Inside the E-ELT
Inside the E-ELT
ASM Mirror Gap Control
ASM Mirror Gap Control
E-ELT mirrors
E-ELT mirrors
E-ELT mirrors
E-ELT mirrors
E-ELT primary mirror prototype segment support systems
E-ELT primary mirror prototype segment support systems
Artist impression of the E-ELT dome
Artist impression of the E-ELT dome
Taking a break
Taking a break
Lunch Break during the VLT Site Testing
Lunch Break during the VLT Site Testing
Site testing for the VLT atop Cerro Armazones
Site testing for the VLT atop Cerro Armazones
E-ELT Tip-tilt Unit
E-ELT Tip-tilt Unit
E-ELT and VLT sizes compared with Brandenburger Tor.
E-ELT and VLT sizes compared with Brandenburger Tor.
Showing 151 to 200 of 317