VLT´s UT2 coating

Paranal engineers carefully follow the first step of the UT2 recoating process, when the primary mirror (M1) cell is detached from the telescope structure. The whole cell weights 45 tonnes and leans on a special crane which takes it out of the telescope building. The cleaning of the VLT´s M1s is a very delicate operation which takes place every 18 months and consists in removing the reflective aluminum layer by chemical washing and then recoating the mirror.

Crediti:

ESO

A proposito dell'immagine

Identificazione:eso-p-mirror-lv1
Tipo:Fotografico
Data di pubblicazione:Lunedì 10 Maggio 2010 10:12
Dimensione:2560 x 1920 px

A proposito delll'oggetto

Nome:Very Large Telescope
Tipo:Unspecified : Technology : Observatory : Telescope
Categoria:Paranal

Formati delle immagini

JPEG grande
1,7 MB

Zoom


Sfondi

1024x768
412,1 KB
1280x1024
621,1 KB
1600x1200
849,5 KB
1920x1200
957,4 KB
2048x1536
1,2 MB