VLT´s UT2 coating

Paranal engineers carefully follow the first step of the UT2 recoating process, when the primary mirror (M1) cell is detached from the telescope structure. The whole cell weights 45 tonnes and leans on a special crane which takes it out of the telescope building. The cleaning of the VLT´s M1s is a very delicate operation which takes place every 18 months and consists in removing the reflective aluminum layer by chemical washing and then recoating the mirror.

Credit:

ESO

Over de afbeelding

Id:eso-p-mirror-lv2
Type:Fotografisch
Publicatiedatum:10 mei 2010 10:12
Grootte:2560 x 1920 px

Over het object

Naam:Very Large Telescope
Type:Unspecified : Technology : Observatory : Telescope
Categorie:Paranal

Afbeeldingstypen

Grote JPEG
1,7 MB

Inzoomen


Achtergrond

1024x768
368,7 KB
1280x1024
577,7 KB
1600x1200
818,2 KB
1920x1200
926,7 KB
2048x1536
1,2 MB