VLT´s UT2 coating

The primary mirror (M1) cell of UT2 is detached from the telescope structure for coating. The whole cell weights 45 tonnes and leans on a special crane which takes it out of the telescope building. The engineers tighten the blue tapes which will support the cover of the mirror during its transportations from the telescope to the Main Maintenance Building (MMB). The cleaning of the VLT´s M1s is a very delicate operation which takes place every 18 months and consists in removing the reflective aluminum layer by chemical washing and then recoating the mirror.

Credit:

ESO

Over de afbeelding

Id:eso-p-mirror-lv3
Type:Fotografisch
Publicatiedatum:10 mei 2010 10:12
Grootte:2560 x 1920 px

Over het object

Naam:Very Large Telescope
Type:Unspecified : Technology : Observatory : Telescope
Categorie:Paranal

Afbeeldingstypen

Grote JPEG
1,7 MB

Inzoomen


Achtergrond

1024x768
431,8 KB
1280x1024
646,0 KB
1600x1200
876,7 KB
1920x1200
1008,9 KB
2048x1536
1,3 MB