VLT´s UT2 coating

The primary mirror (M1) cell of UT2 is detached from the telescope structure for coating. The whole cell weights 45 tonnes and leans on a special crane which takes it out of the telescope building. The engineers tighten the blue tapes which will support the cover of the mirror during its transportations from the telescope to the Main Maintenance Building (MMB). The cleaning of the VLT´s M1s is a very delicate operation which takes place every 18 months and consists in removing the reflective aluminum layer by chemical washing and then recoating the mirror.

Crédit:

ESO

À propos de l'image

Identification:eso-p-mirror-lv3
Type:Photographique
Date de publication:10 mai 2010 10:12
Taille:2560 x 1920 px

À propos de l'objet

Nom:Very Large Telescope
Type:Unspecified : Technology : Observatory : Telescope
Catégorie:Paranal

Image Formats

Grand JPEG
1,7 Mio
JPEG taille écran
361,6 Kio

Zoomable


Fonds d'écran

1024x768
431,8 Kio
1280x1024
646,0 Kio
1600x1200
876,7 Kio
1920x1200
1008,9 Kio
2048x1536
1,3 Mio