Use Case:  Close Enclosure

Description:  Close Telescope Enclosure and Inflate Seals

Role(s)/Actor(s): 
Primary: Operator,Maintenance
Secondary: Enclosure

Priority: Critical

Performance: 2 minutes

Frequency: Once per day at end of night. Or any time when meteo conditions require to close.

[Design Description
  Entry]

Package Assignment:  Enclosure Subsystem.

Preconditions: 

Since this action is Critical, the preconditions must be checked again before proceeding.
If one of them is not satisfied, no recovery attempt due to potential danger of mechanical damage.
ATCS shall raise an alarm and return ERROR reply

Basic Course: 

Exception Course: Check failed

Exception Course: Command failed

Postconditions: 

Issues to be Determined or Resolved: 

Notes:

Last modified: Wed Oct 30 17:16:30 UTC 2002