Use Case:  Open Enclosure

Description:  Deflate seals and open telescope enclosure

Role(s)/Actor(s): 
Primary: Operator, Maintenance
Secondary: Enclosure, AC, ASM

Priority: Critical

Performance: 2 minutes

Frequency: Once per day at beginning of night. Or at any time when required for maintenance purpose, or during observation when meteo conditions allow to re-open.

[Design Description
  Entry]

Package Assignment:  Enclosure Subsystem.

Preconditions: 

Basic Course: 

Exception Course: Command failed

Postconditions: 

Issues to be Determined or Resolved:  Check with AMOS ICD for the status of the enclosure (detailed Dome/Seals).
Check range of shell opening angle [0 is Closed; 90 is Open]

Notes: There is one single command to open/close the enclosure; the AMOS PLC takes care of inflating/deflating the seals as part of the command. It is AMOS responsibility to ensure the enclosure gets closed when required.

Last modified: Wed Oct 30 17:06:22 UTC 2002