Use Case:  Prepare FSS Setup

Description:  Prepare the configuration setup for FSS

Role(s)/Actor(s): 
Primary: Operator, Maintenance

Priority: Critical

Performance: 1 second

Frequency: At any time

[Design Description
  Entry]

Package Assignment:  Field Stabilization Subsystem.

Preconditions: 

Basic Course: 

Exception Course: Command failed

Exception Course: Check failed

Postconditions: 

Issues to be Determined or Resolved:  List of setup parameters for APD

Notes:

Last modified: Thu Jun 28 13:18:43 UTC 2001