Use Case:  Send FSS Setup

Description:  Send the configuration setup to the FSS Strap

Role(s)/Actor(s): 
Secondary: FSS Strap

Priority: Critical

Performance: 1 second

Frequency: At any time

[Design Description
  Entry]

Package Assignment:  Field Stabilization Subsystem.

Preconditions: 

Basic Course: 

Exception Course: Command failed

Postconditions: 

Issues to be Determined or Resolved: 

Notes:

Last modified: Thu Jun 28 13:18:51 UTC 2001