Technical Reports etc.
- [2003-07-03] Study of Combined Thorium/Argon/Neon Lamp
- [2003-07-20] Study of Flexure between FibreHead and Technical CCD
- [2004-04-27] Installation of new CCD clock patterns
- [2004-06-07] Actual S/N vs. Heidelberg ETC (Preliminary)
- [2005-10-14] Internal
Flatfield Lamp warmup time
- [2005-11-26] Internal
Flatfield Lamp Stability over hours, days, weeks
- [2006-06-03] The new FEROS ADC
