Use Case:  Close Enclosure

Description Close Telescope Enclosure and Inflate Seals

Role(s)/Actor(s)
Primary: Operator,Maintenance
Secondary: Enclosure

PriorityCritical

Performance2 minutes

FrequencyOnce per day at end of night. Or any time when meteo conditions require to close.

[Design Description
  Entry]

Package Assignment Enclosure Subsystem.

Preconditions

Since this action is Critical, the preconditions must be checked again before proceeding.
If one of them is not satisfied, no recovery attempt due to potential danger of mechanical damage.
ATCS shall raise an alarm and return ERROR reply

Basic Course

Exception CourseCheck failed

Exception CourseCommand failed

Postconditions

Issues to be Determined or Resolved

Notes:

Last modified: Wed Oct 30 17:16:30 UTC 2002