Use Case:  Configure AT to Desired State After Relocation

Description After the relocation of the AT has been completed and the AT correctly anchored on the destination station, the AT is configured back to the day-time standby state or directly to a state which allows to enter into the preparation phase.

Role(s)/Actor(s)
Primary: Operator, Maintenance

Priority Major

Performance A few minutes

Frequency After every relocation of the AT

[Design Description
  Entry]

Package Assignment Mode Switching.

Preconditions

Basic Course

Postconditions

Issues to be Determined or Resolved

Notes:The msw "Focus Station" concept (on the UTs used to define NA, NB, CA focus) can be reused to define the station on which the AT is located. Instead of a "Change Focus" sequence one could have a "Change Station" sequence. The actual Observing Station is to be kept available for VLTICS-ISS query (see Get AT Observing Station ID).

Last modified: Tue Apr 16 15:15:32 UTC 2002