The winding road to Cerro Armazones

This image shows the winding road up to the newly flattened Cerro Armazones site, which engineers levelled with in a series of blasts in June 2014. They aimed to remove a total of 220 000 cubic metres of rock for the 300 x 150 metres platform, in preparation of the construction of the Extremely Large Telescope (ELT).

Credit:

M. Struik (CERN)/ESO

About the Image

Id:g0020999-final-cc
Type:Photographic
Release date:21 September 2016, 15:29
Size:3317 x 1866 px

About the Object

Name:Cerro Armazones, Extremely Large Telescope
Type:Unspecified : Technology : Observatory
Category:ELT

Image Formats

Large JPEG
1.9 MB
Screensize JPEG
271.9 KB

Zoomable


Wallpapers

1024x768
330.4 KB
1280x1024
540.6 KB
1600x1200
761.6 KB
1920x1200
880.8 KB
2048x1536
1.1 MB