| I. | Separation of tank from head and head disassembly | |
| II. | Tank baking in oven at 95 °C | |
| III. | Head cleaning
|
|
| IV. | Tank pumping ( sorption pump 130 °C, mass spectrum analysis ) | |
| V. | Integration and assembly of head with pre-adjustment | |
| VI. | Inside cryostat wiring | |
| VII. | Gluing of sensors and cleaning of residuals | |
| VIII. | Testing of wiring | |
| IX. | CCD alignment | |
| X. | Integration of head with tank - leak test | |
| XI. | Pumping ( may be with heating from outside ) | |
| XII. | Cryostat ready |