Description:
Perform motion for beam alignement.
Role(s)/Actor(s):
Primary: PRIMA Metrology Control System
Secondary: FSU-A Alignment Unit, FSU-B Alignment Unit,
MIDI Metrology Motors, AMBER Metrology Motors
Priority: Major
Performance: a
few seconds
Frequency: At any
time during alignment
Preconditions:
Basic Course:
- Send command MOVEABS <axis>,<position> to the Beam Alignment sub-system
- Beam Alignment sub-system initiates the motion to the
absolute position <position> on the selected axis
- Beam Alignment sub-system sends OK/ERROR reply
Alternate Course:
- Send command MOVEREL
<axis>,<offset> to the Beam Alignment sub-system
- Beam Alignment sub-system initiates the relative motion of the
offset <offset> on the selected axis
- Beam Alignment sub-system sends OK/ERROR reply
Postconditions:
- Motorized axis is in position standing still; position loop is closed.
Issues to be Determined or
Resolved: Number and kind of motorized axes
Notes:
Last modified: Tue Feb 25 15:16:44 MET 2003