mirror sites: PL (internal link) HQ     [?]

Health Check monitor

 

CAL | HC | refs | QC
HealthCheck Monitor
   HOME | UsersGuide
  sl icon ALL INSTRUMENTS
 
all KPI reports
GRAVITY:
detector
Other HC:
QC links:
        [page auto-refreshes after 300 sec]   [stop | on]            [press Ctrl+Shift+R to enforce refresh of scores, dates and news]
GRAVITY trending system: SCORES (quick-look)
HELP USERS-GUIDE MORE
Last update: 2022-01-21T18:28:12 (UT)
  | now: 2022-01-22T02:25:38 (UT) muc05 QC pipeline: gravity-1.5.0 (installed 2021-09-01)
same group: dark_level dark_rms   badpix acqcam
General news:
GRAVITY news:  
Report news: 2022-01-12 Dark in FT can have high values, actions needed to calibrate science data. See PPRS 78414 for details.

dark level of the science detector has been decreasing for about two months. Known and monitored in PPRS-082407 [qc_gravity@eso.org]
DATE*: [?] 2022-01-15
report | NLT
2022-01-16
report | NLT
2022-01-17
report | NLT
2022-01-18
report | NLT
2022-01-19
report | NLT
2022-01-20
report | NLT
2022-01-21
no data | NLT
r...
Raw CAL displays:
raw raw raw raw raw raw no CAL raw files
P...
CAL product quality:
products products products products products products no CAL products
 
transfer   ngas [?]

HC plot | FULL | history ... | plot tutorial ... | contact | HC_docu... | quality events...                 daily/often; important to check     [?]
*Date on this monitor changes at 21:00 UT
DARK level (scores, last 7 days up to 2022-01-20*)
1: SC_SPLIT_LOW
2|
2: SC_SPLIT_MED
23|
3: SC_SPLIT_HIGH
4|
4: FT_SPLIT
24|
5: SC_COMB_LOW
6|
6: SC_COMB_MED
2|
7: SC_COMB_HIGH
3|
8: FT_COMB
3|
Quality comments (certified nights only):
Plot Date* AB name (linked to score report) score product quality comment
Plot 12021-12-27GRAVI.2021-12-27T21:43:34.811_tpl.ab
bad pix on acq camera high but no issue for darks. Darkrms on upper threshold.
Plot 12021-12-31GRAVI.2022-01-01T13:02:08.500_tpl.ab
number of bad pix on acq camera high but no issue for dark.
Plot 22022-01-13GRAVI.2022-01-14T07:47:51.152_tpl.ab
numpix zero acq high but no issue for dark.
Plot 22022-01-14GRAVI.2022-01-14T23:37:53.906_tpl.ab
numpix zero acq generally high
Plot 22022-01-14GRAVI.2022-01-15T00:28:18.033_tpl.ab
numpix zero acq generally high
Plot 22022-01-14GRAVI.2022-01-15T01:18:39.159_tpl.ab
numpix zero acq generally high
Plot 22022-01-14GRAVI.2022-01-15T02:15:51.303_tpl.ab
numpix zero acq generally high
Plot 22022-01-14GRAVI.2022-01-15T03:06:18.431_tpl.ab
numpix zero acq generally high
Plot 22022-01-14GRAVI.2022-01-15T04:02:57.574_tpl.ab
numpix zero acq generally high
Plot 22022-01-14GRAVI.2022-01-15T04:54:30.703_tpl.ab
numpix zero acq generally high
Plot 22022-01-15GRAVI.2022-01-16T03:13:40.077_tpl.ab
numbers of bad pix on acq camera high
Plot 22022-01-15GRAVI.2022-01-16T05:13:16.378_tpl.ab
numbers of bad pix on acq camera high
Plot 22022-01-16GRAVI.2022-01-17T09:18:31.521_tpl.ab
numpix zero acq high
Plot 32021-11-17GRAVI.2021-11-18T09:08:43.431_tpl.ab
FT dark RMS at upper level
Plot 32021-11-18GRAVI.2021-11-19T09:26:34.153_tpl.ab
FT dark RMS high
Plot 32021-11-19GRAVI.2021-11-20T15:57:30.500_tpl.ab
FT Dark level high
Plot 32021-11-21GRAVI.2021-11-22T13:11:02.961_tpl.ab
FT dark RMS high FT dark level high but ok for P2VM
Plot 42022-01-13GRAVI.2022-01-14T07:47:51.152_tpl.ab
numpix zero acq high but no issue for dark.
Plot 42022-01-14GRAVI.2022-01-14T23:37:53.906_tpl.ab
numpix zero acq generally high
Plot 42022-01-14GRAVI.2022-01-15T00:28:18.033_tpl.ab
numpix zero acq generally high
Plot 42022-01-14GRAVI.2022-01-15T01:18:39.159_tpl.ab
numpix zero acq generally high
Plot 42022-01-14GRAVI.2022-01-15T02:15:51.303_tpl.ab
numpix zero acq generally high
Plot 42022-01-14GRAVI.2022-01-15T03:06:18.431_tpl.ab
numpix zero acq generally high
Plot 42022-01-14GRAVI.2022-01-15T04:02:57.574_tpl.ab
numpix zero acq generally high
Plot 42022-01-14GRAVI.2022-01-15T04:54:30.703_tpl.ab
numpix zero acq generally high
Plot 42022-01-15GRAVI.2022-01-16T03:13:40.077_tpl.ab
numbers of bad pix on acq camera high
Plot 42022-01-15GRAVI.2022-01-16T05:13:16.378_tpl.ab
numbers of bad pix on acq camera high
Plot 42022-01-16GRAVI.2022-01-17T09:18:31.521_tpl.ab
numpix zero acq high
Plot 52021-07-21GRAVI.2021-07-22T08:48:16.629_tpl.ab
FT dark level high
Plot 62022-01-19GRAVI.2022-01-20T12:02:49.587_tpl.ab
trend of decreasing biasavf sc now hitting lower limit but ok to calibrate the night
Plot 72022-01-12GRAVI.2022-01-13T10:48:59.979_tpl.ab
number of bad pixel on acq cam high
Plot 82022-01-19GRAVI.2022-01-20T12:02:49.587_tpl.ab
trend of decreasing biasavf sc now hitting lower limit but ok to calibrate the night
"Date" links to complete AB product page; "AB" links to score report


Scores

This is the quick-look version of the HealthCheck (HC) Monitor. It displays scores for each HC report. Scores are flags assessing the compliance of data points with configured thresholds. A green score indicates that the corresponding instrument component is performing as expected (OK) in the monitored time range. A red score is the result of a parameter exceeding these thresholds, and may indicate a problem.

Scoring has both an automatic and an interactive component. The automatic part consists of monitoring, pipeline-processing, and flagging new data once per hour, 24/7. The interactive component is the certification step which is performed by the QC scientist. It involves the analysis of red scores: A confirmation of their validity, an assessment of the severity of the red score and its cause, and often an analysis comment in the AB monitor. In cases of serious instrument issues, feedback to Paranal operations and/or USD is given. However, this analysis step cannot be guaranteed to be available at the same time as the automatic scoring. Do not expect new analysis results during weekends, holidays or other off-duty times.

The last score, per plot, will determine the current plot score, which is displayed as a larger symbol. The other, older plot scores display only the recent history of instrument scores. As part of the automatic scoring, a red score will be automatically overwritten by any new data that produce a green score. The date of any score can be seen by mousing over its score symbol. As part of the interactive analysis, there is also the possibility for the QC scientist to manually adjust thresholds and turn a red score into a green one, or to delete a false red score. Often this occurs after interaction with Paranal staff, after discussing the significance of the alert score. Use the 'contact' link to get in touch.

If available, a table with quality comments is displayed on the scores&comments page, usually offering additional information about data with red scores. A comment may refer to the quality of the pipeline products and not necessarily to the exact parameter scored in this report. Quality comments are entered by the QC scientist as part of the analysis workflow.

Scores are based on the QC data for the last 7 days before the indicated date. This date is always the last date with data for this report.

The 'Quality comments' are collected from the QC scientist certification review and are available for certified nights.

Information on demand:
- scroll over the small symbols and see the individual dates of the underlying data.
- click on them and see the detailed score report for that particular data set.

More ...