Use Case:  Start FSS Acquisition

Description:  Start the APD measurements

Role(s)/Actor(s): 
Primary: Operator, Maintenance
Secondary: FSS Strap

[Design Description
  Entry]

Package Assignment:  Field Stabilization Subsystem.

Preconditions: 

Basic Course: 

Subflow: in Open Loop

Subflow: in Close Loop

Exception Course: Command failed

Postconditions: 

Issues to be Determined or Resolved: 

Issue 1: It must be defined how we know that the loop is stable: should we wait for a fixed time, or better should we use some diagnostic? What? Suggestions please….


Issue 2:The beahviour of the M6 as controlled by the APD system must be still analyzed on more details. This will most probably cause modifications in the FSS and M6 Use Cases and the introduction of new Use Cases for the M6.

ACTION MCO: Verify the following points regarding the interaction of the STRAP system with the M6: