Use Case:  Monitor Transporter Status

Description Monitor the status of the Transporter PLC

Role(s)/Actor(s)
Primary: Operator,Maintenance
Secondary: Transporter

PriorityDesirable

Performance1 second

Frequencyonce per minute (TBC)

[Design Description
  Entry]

Package Assignment Transporter Subsystem.

Preconditions

Basic Course

Exception CourseCommand failed

Exception CourseCheck failed

Postconditions

Issues to be Determined or Resolved

Notes:

Last modified: Tue Nov 27 09:05:13 UTC 2001