Use
Case: Prepare for Pupil Alignment
Description:
Prepare the AT subsystems so that they are ready for the VLTI ISS to perform
the VLTI Pupil Alignment. Check that sub-systems are online. Position the
CBSD to the appropriate position. Switch Pupil beacon.
Role(s)/Actor(s):
Primary: User (Operator, Maintenance, VLTI-ISS)
Secondary: Coude Beam Switching Device, Pupil Beacon,
Priority:
Major
Performance:
A
couple of seconds (10 to 15 seconds)
Frequency:
Asynchronous,
typ. once a day before starting observations, or any time for maintenance/test
purpose
Preconditions:
-
Coude Beam switching device is switched On and ONLINE
-
M6 is set to the appropriate position (depends on Azimuth angle!) so that
the Nasmyth Beacon image falls at the X-Y location corresponding to the
"VLTI Coude pointing reference point" in the Coudé Focus
-
ROS shutter is open
Basic
Course:
Exception
Course: Command failed
Postconditions:
-
Devices in appropriate position for Pupil Alignment
-
ATCS ready to receive M10 tilt command from ISS
Issues
to be Determined or Resolved:
Notes:
Last modified: Thu Jun 28 13:39:52 UTC 2001