Use Case:  Prepare for Pupil Alignment

Description Prepare the AT subsystems so that they are ready for the VLTI ISS to perform the VLTI Pupil Alignment. Check that sub-systems are online. Position the CBSD to the appropriate position. Switch Pupil beacon.

Role(s)/Actor(s):
Primary: User (Operator, Maintenance, VLTI-ISS)
Secondary: Coude Beam Switching Device,  Pupil Beacon, 

Priority: Major

Performance: A couple of seconds (10 to 15 seconds)

Frequency: Asynchronous, typ. once a day before starting observations, or any time for maintenance/test purpose

[Design Description
  Entry]

Package Assignment Optical Adjustments.

Preconditions:

Basic Course: Exception Course: Command failed

Postconditions:

Issues to be Determined or Resolved:

Notes:
 

Last modified: Thu Jun 28 13:39:52 UTC 2001