Description: This collaboration case is responsible for moving the probes (CCD window and FSS Translation Stage) to the location of the selected guide star.
Performance: some milli-seconds
Frequency: Any time
Preconditions:
- ATCS is ONLINE
- GS coordinates are available
Basic Course:
- Send command PRGS with (alpha, delta) coordinates for the probe.
- ATCS Sets the Guide Reference Point
Exception Course: Command failed
Postcondition1: FAS Reference point is set
Postcondition2: FSS Translation Stage in position and tracking
- ATCS Prepares the FAS setup:
- Infinite Loop
- Full frame
- Display
- No computation
- UIT set according to the magnitude of the GS (TBD)
Exception Course: Command failed
- ATCS Starts Field Acquisition
Exception Course: Command failed
Exception Course: Command failed
- ATCS returns ERROR reply.
Postconditions:
- Probes are located on the GS.
- FAS CCD displays field
Issues to be Determined or Resolved:
Notes:
Last modified: Thu Dec 20 15:24:36 UTC 2001