 |
 |
 |
 |
| Light curve of exoplanet WASP-19b |
E-ELT METIS Meeting, December 2009 |
Panorama on Cerro Ventarrones, Chile |
E-ELT site testing — Vizcachas / Chile |
 |
 |
 |
 |
| A cutaway drawing of the VISTA camera |
UT2 control 2 |
Earth's Shadow seen from Paranal |
VLT Primary Mirror |
 |
 |
 |
 |
| The VLT Test Camera |
M1 Cell Elevator, Dec2005 |
ELT-Baseline Meeting |
Telescope Startup |
 |
 |
 |
 |
| Principle of Active Optics (ActO) |
VISTA coating chamber |
Engineers office at the Control building |
VISTA Telescope Structure |
 |
 |
 |
 |
| Milky Way Above the VLT Platform |
Sunrise at Paranal |
Daily Meeting |
The giant domes of the VLT open as the sun sets - 3D |
 |
 |
 |
 |
| E-ELT Active Segmented Mirror |
Daytime Operation of a VLT, Jan2007 |
SINFONI attached to YEPUN |
Instrument Platform - 3D |
 |
 |
 |
 |
| VISTA Telescope Structure |
Auxillary Telescopes at sunrise |
Vitacura Office |
Endless night |
 |
 |
 |
 |
| VLTI M12 |
Residencia and Base Camp |
Observing with the VLT |
E-ELT Baseline Meeting, March 2008 |
 |
 |
 |
 |
| Construction of VISTA exterior December 2004 |
Three ATs at Paranal, Jan2007 |
Engineers at the VLT |
Tropical garden, residencia, Paranal |
 |
 |
 |
 |
| The VLT on top of Cerro Paranal |
Paranal Bus Service |
Meteo_Paranal |
Paranal moon shadow |
 |
 |
 |
 |
| Three Auxiliary Telescopes and VLTI building |
Starting up |
Auxiliary Telescopes on Paranal |
Service Mode Observations at the VLT |
 |
 |
 |
 |
| Before sunrise at the VLT |
VISTA Telescope Structure |
Active Phasing Experiment (APE) for the ELT |
2009 to be the International Year of Astronomy |
 |
 |
 |
 |
| Bringing Science out of the Lab into the Classroom |
Discovery X-Ray Image of the Distant Cluster |
Working on the M3 tower |
The Atacama Compact Array |