Service Mode Phase 2 for Observing Period 100

Published: 04 Jul 2017
Paranal at sunset

With the release of the telescope schedule, the preparation of Service Mode (SM) observations (Phase 2) starts. The deadline for the submission of the Phase 2 material for Period 100 observations is 3 August 2017.

Detailed information on Phase 2 observation preparation can be found here. The Phase 2 Preparation tool (P2PP version 3.4.2) released for Period 96 must be used for the preparation of SM observations for Paranal instruments in Period 100. Further assistance is available via direct e-mail to usd-help@eso.org.