¡Lo lamentamos! Esta página no está disponible en la lengua seleccionada, en su lugar le mostramos la versión original.
VLT´s UT2 coating
Paranal engineers carefully follow the first step of the UT2 recoating process, when the primary mirror (M1) cell is detached from the telescope structure. The whole cell weights 45 tonnes and leans on a special crane which takes it out of the telescope building. The cleaning of the VLT´s M1s is a very delicate operation which takes place every 18 months and consists in removing the reflective aluminum layer by chemical washing and then recoating the mirror.
Crédito:ESO
Sobre la imagen
Identificador: | eso-p-mirror-lv1 |
Tipo: | Fotográfico |
Fecha de publicación: | 10 de Mayo de 2010 a las 10:12 |
Tamaño: | 2560 x 1920 px |
Sobre el objeto
Nombre: | Very Large Telescope |
Tipo: | Unspecified : Technology : Observatory : Telescope |
Categoría: | Paranal |