VLT´s UT2 coating

Paranal engineers carefully follow the first step of the UT2 recoating process, when the primary mirror (M1) cell is detached from the telescope structure. The whole cell weights 45 tonnes and leans on a special crane which takes it out of the telescope building. The cleaning of the VLT´s M1s is a very delicate operation which takes place every 18 months and consists in removing the reflective aluminum layer by chemical washing and then recoating the mirror.

Crédit:

ESO

À propos de l'image

Identification:eso-p-mirror-lv1
Type:Photographique
Date de publication:10 mai 2010 10:12
Taille:2560 x 1920 px

À propos de l'objet

Nom:Very Large Telescope
Type:Unspecified : Technology : Observatory : Telescope
Catégorie:Paranal

Formats des images

Grand JPEG
1,7 Mio
JPEG taille écran
345,3 Kio

Zoomable


Fonds d'écran

1024x768
412,1 Kio
1280x1024
621,1 Kio
1600x1200
849,5 Kio
1920x1200
957,4 Kio
2048x1536
1,2 Mio