VLT´s UT2 mirror recoating

Preparations for the recoating the VLT's Unit Telescope 2 (Kueyen) primary mirror (M1). A special crane takes the M1 cell, which weighs 45 tonnes, out of the telescope building. The cleaning of the Very Large Telescope primary mirrors is a very delicate operation which takes place every 18 months and consists in removing the aluminium layer by chemical washing and then recoating the mirror.

Crédito:

ESO

Sobre la imagen

Identificador:eso-p-transport-lv1
Tipo:Fotográfico
Fecha de publicación:10 de Mayo de 2010 a las 10:12
Tamaño:2475 x 1828 px

Sobre el objeto

Nombre:Paranal, Very Large Telescope
Tipo:Unspecified : Technology : Observatory : Telescope
Categoría:Paranal

Formatos de imagen

JPEG grande
1,6 MB

Zoom


Fondo de pantalla

1024x768
404,7 KB
1280x1024
643,1 KB
1600x1200
888,9 KB
1920x1200
1002,6 KB
2048x1536
1,3 MB