VLT´s UT2 coating

The VLT's Unit Telescope 2 (Kueyen) primary mirror (M1) on its way to being recoated. A special truck carries the whole M1 cell, which weighs 45 tonnes, from the VLT platform down to the Main Maintenance Building (MMB). The truck moves at no more than 5 km/h, allowing engineers to follow it by walking fast. The driver has to be extremely careful and must never touch the brake! The cleaning of the VLT´s primary mirrors is a very delicate operation which takes place every 18 months and consists in removing the reflective aluminum layer by chemical washing and then recoating the mirror.

Crédit:

ESO

À propos de l'image

Identification:eso-p-transport-lv2
Type:Photographique
Date de publication:10 mai 2010 10:12
Taille:2146 x 1502 px

À propos de l'objet

Nom:Very Large Telescope
Type:Unspecified : Technology : Observatory : Telescope
Catégorie:Paranal

Formats des images

Grand JPEG
822,3 Kio
JPEG taille écran
196,7 Kio

Zoomable


Fonds d'écran

1024x768
264,0 Kio
1280x1024
406,1 Kio
1600x1200
562,8 Kio
1920x1200
670,2 Kio
2048x1536
829,1 Kio