Sorry! This page is not yet available in your preferred language, so we're displaying the original version instead.
Active Phasing Experiment (APE) for the ELT
The ELT will have a segmented mirror. For the adaptive optics to work properly and correct the blurring introduced by the atmosphere turbulence, the segments have to be aligned as if their were part of a single large mirror, with a nanometer accuracy (1 millionth of a mm). In order to experiment with the challenges of this alignment, the APE system will be installed on the VLT, mimicking a segmented mirror and its issues. On the image, the completed 61 segment APE mirror is ready for tests in the Garching laboratory.
Kredit:ESO/H.H.Heyer
O snímku
Id: | esopia-eelt-5848 |
Typ: | Fotografický |
Datum zveřejnění: | 3. prosince 2009 23:22 |
Velikost: | 3710 x 2653 px |
O objektu
Jméno: | Extremely Large Telescope |
Typ: | Unspecified : Technology : Observatory : Instrument |
Kategorie: | ELT |