Phase 2 Waiver Requests
To ensure the observing efficiency and flexibility of Service Mode observing, ESO has implemented a number of rules, procedures and limitations on programmes scheduled for Service mode. Typically, these have to do with OB construction, observing strategy, or instrument modes available.
In some special cases it is possible to admit some justified exceptions to these rules with a reduced operational impact. However, it is necessary that the exceptions have been reviewed and authorized by ESO well in advance. The Phase 2 Waiver Request procedure is the channel to make this possible.
Instrument independent conditions where a Phase 2 Waiver Request is needed
- OBs that will take longer than one hour to execute (except AMBER observations with more than one spectral band).
- Concatenated OBs prepared with P2PP3 that will take longer than one hour to executed (in Period 89 this applies only to VISTA, VST and UT2 instruments observations).
- Sequences of OBs that need to be executed consecutively (with the exception of science/calibration pairs, and OBs prepared with P2PP3 for VISTA, VST and UT2 instruments). Please note that justifications based on the reduction of execution overheads cannot be accepted, as sequences of OBs decrease the flexibility of Service Mode observing and thus the operational efficiency of the telescopes.
- OBs that contain multiple instrument configurations. As an exception, multiple broad-band filters in a single OB can normally be allowed without a waiver, and for FORS2 up to two interference filters may be used in a single OB without a waiver.
- Delayed submission of Phase 2 material needed. This is admissible only under exceptional circumstances justified by scientific reasons, such as the need to wait for the outcome of another observing run before preparing the OBs. Users whose schedule prevents them from submitting their Phase 2 package by the due date are strongly encouraged to find a collaborator who can do it, rather than submitting a waiver request, as ESO cannot guarantee the prompt review and validation of Phase 2 packages submitted after the Phase 2 deadline.