M1 Mirror Transport Clip 2
VLT Mirror is Polished Clip 1
M1 Mirror Cell
M1 Cell Arrival in Chile
M1 Dummy Cell Positioning
VLT Structure Rotation
Paranal Weather Station
Paranal Weather Station
VLT - UT1 and UT2 - December 1996
M1 Mirror Stress Testing
Basecamp at Paranal
ESO Council visiting Ansaldo (part 9)
Polishing M1 Mirror
Drilling of the M1 Mirror
M1 Cell Rotation at REOSC
ESO Council visiting Ansaldo (part 2)
M1 Mirror Transport Clip 11
VLT Structure
VLT Enclosure Mount
M1 Mirror Transport Clip 5
Sunset at the Paranal Platform
VLT - UT1, UT2 and UT3 - December 1996
VLT - UT2 - 1996
M1 Mirror Assembly Process
Driving through the Desert
VLT - Mirror Casting - 1993 - clip 1
VLT - Mirror Casting - 1993 - clip 2
VLT - Mirror Casting - 1993 - clip 8
Blasting in the Desert
M1 Mirror Transport Clip 10
M1 Mirror Assembly Process
VLT Interferometric Tunnel
VLT Structure
M1 Cell Arrival in Chile
VLT - Mirror Casting - 1993 - clip 5
M1 Mirror Lifting
Transporting the VLT Mirror - 1993 - clip 3
Removing Debris from VLT construction, 1991 - clip 4
Removing Debris from VLT construction, 1991 - clip 3
Drilling in the Desert
VLT Structure
VLT Enclosure
M1 Dummy Cell Positioning
Constructing the VLT Control Building
M1 Cell Arrival at Paranal
The Paranal Site
M1 Mirror assemby process
M1 Cell Arrival in Chile
M1 Mirror Transport Clip 9
ESO Council visiting Ansaldo (part 1)
Showing 501 to 550 of 655