Multi-Conjugate Adaptive Optics Demonstrator (MAD) Control
Multi-Conjugate Adaptive Optics Demonstrator (MAD) Control
Engineers at the VLT
Engineers at the VLT
MUSE Interior Testing
MUSE Interior Testing
The MUSE instrument makes the final ascent to the Very Large Telescope at ESO’s Paranal Observatory
The MUSE instrument makes the final ascent to the Very Large Telescope at ESO’s Paranal Observatory
VLT Unit Telescope
VLT Unit Telescope
Filming the VLT Auxiliary Telescopes, 2009
Filming the VLT Auxiliary Telescopes, 2009
Windspeed testing
Windspeed testing
Wind site-testing on Cerro Paranal
Wind site-testing on Cerro Paranal
Early site testing on La Montura
Early site testing on La Montura
Sunset from the office
Sunset from the office
Sunrise over a Snow-Covered Desert
Sunrise over a Snow-Covered Desert
Paranal under Snow
Paranal under Snow
The ESO Outreach Partner Organisations Network
The ESO Outreach Partner Organisations Network
Interferometric Tunnel
Interferometric Tunnel
Paranal Residencia
Paranal Residencia
Paranal Mirror Cleaning Unit
Paranal Mirror Cleaning Unit
Paranal Residencia
Paranal Residencia
Paranal
Paranal
Paranal
Paranal
Model of the ESO Very Large Telescope
Model of the ESO Very Large Telescope
A raw spectrum from ISAAC
A raw spectrum from ISAAC
A raw image from ISAAC
A raw image from ISAAC
MIDI detector image
MIDI detector image
A raw image straight from the VISIR instrument on the VLT
A raw image straight from the VISIR instrument on the VLT
Raw image from the NACO instrument
Raw image from the NACO instrument
Raw image from a KMOS detector
Raw image from a KMOS detector
VIRCAM’s pawprint
VIRCAM’s pawprint
A raw image obtained with SINFONI
A raw image obtained with SINFONI
Raw image from VIMOS
Raw image from VIMOS
Annular Groove Phase Mask
Annular Groove Phase Mask
Minister Heubisch and ESO Director General Tim de Zeeuw
Minister Heubisch and ESO Director General Tim de Zeeuw
Paranal control building under construction
Paranal control building under construction
Paranal Inauguration
Paranal Inauguration
Paranal from the desert
Paranal from the desert
Excavations at Paranal
Excavations at Paranal
Solid foundations
Solid foundations
Tools for site testing on Cerro Armazones
Tools for site testing on Cerro Armazones
Early site testing of Cerro Armazones
Early site testing of Cerro Armazones
Rock blasting
Rock blasting
Clocks at Paranal
Clocks at Paranal
Concept drawing of the VLT
Concept drawing of the VLT
Cerro Paranal before the observatory
Cerro Paranal before the observatory
First light of one of the VLT Unit Telescopes
First light of one of the VLT Unit Telescopes
VLT First Light
VLT First Light
The Paranal Fire Brigade
The Paranal Fire Brigade
Delegation from the University of Liège at Paranal
Delegation from the University of Liège at Paranal
Honorary Consuls from Antofagasta visit Paranal
Honorary Consuls from Antofagasta visit Paranal
Kueyen is Opening
Kueyen is Opening
Evening at the Paranal Observatory (13 April 1998)
Evening at the Paranal Observatory (13 April 1998)
World's Largest Mirror Approaches "First Light" (16 April 1998)
World's Largest Mirror Approaches "First Light" (16 April 1998)
Showing 2051 to 2100 of 2305