M5 Cell Structure contract signed
At a ceremony at ESO Headquarters in Garching, Germany on 29 November 2019, ESO signed a contract with SENER Aerospacial for the design and production of the cell for the M5 mirror of the Extremely Large Telescope (ELT). The contract was signed by ESO’s Director General Xavier Barcons (on the left) and the General Director of SENER Aeroespacial José Julián Echevarría (on the right).
Créditos:ESO
Sobre a imagem
Id: | M5cell_barcons_echevarria |
Tipo: | Fotográfico |
Data de divulgação: | 2 de Dezembro de 2019 às 10:30 |
Anúncios relacionados: | ann19060 |
Tamanho: | 4841 x 3227 px |
Sobre o objeto
Nome: | Meeting |
Tipo: | Unspecified : People |
Categoria: | ELT People and Events |
Formatos de imagens
JPEG grande
3,8 MB
Publication TIFF 4K
17,5 MB
JPEG para impressão
2,6 MB
JPEG para visualização
223,2 KB