M5 Cell Structure contract signed

At a ceremony at ESO Headquarters in Garching, Germany on 29 November 2019, ESO signed a contract with SENER Aerospacial for the design and production of the cell for the M5 mirror of the Extremely Large Telescope (ELT). The contract was signed by ESO’s Director General Xavier Barcons (on the left) and the General Director of SENER Aeroespacial José Julián Echevarría (on the right).

Crédito:

ESO

Sobre la imagen

Identificador:M5cell_barcons_echevarria
Tipo:Fotográfico
Fecha de publicación:2 de Diciembre de 2019 a las 10:30
Anuncios relacionados:ann19060
Tamaño:4841 x 3227 px

Sobre el objeto

Nombre:Meeting
Tipo:Unspecified : People
Categoría:ELT
People and Events

Formatos de imagen

JPEG grande
3,8 MB

Zoom


Fondo de pantalla

1024x768
261,9 KB
1280x1024
397,5 KB
1600x1200
544,4 KB
1920x1200
636,5 KB
2048x1536
854,4 KB