VLT´s UT2 coating
The VLT's Unit Telescope 2 (Kueyen) primary mirror (M1) on its way to being recoated. A special truck carries the whole M1 cell, which weighs 45 tonnes, from the VLT platform down to the Main Maintenance Building (MMB). The truck moves at no more than 5 km/h, allowing engineers to follow it by walking fast. The driver has to be extremely careful and must never touch the brake! The cleaning of the VLT´s primary mirrors is a very delicate operation which takes place every 18 months and consists in removing the reflective aluminum layer by chemical washing and then recoating the mirror.
Källa:ESO
Om bilden
ID: | eso-p-transport-lv2 |
Typ: | Foto |
Publiceringsdatum: | 10 maj 2010 10:12 |
Storlek: | 2146 x 1502 px |
Om objektet
Namn: | Very Large Telescope |
Typ: | Unspecified : Technology : Observatory : Telescope |
Kategori: | Paranal |