UVES Documentation
In this page, you will find the links to the manuals needed to prepare and analyse UVES observations. Please make sure to download the manuals corresponding to the period in which the observations will take place.
All the manuals are in Adobe's Acrobat format.
- UVES User Manual
All the information about the instrument itself, its modes and their characteristics.
- Period 85, to be used for Phase II preparation for observations in the P85 period (Apr.2010-Sep.2010).
- Period 86, to be used for Phase II preparation for observations in the P86 period (Oct.2010-Mar.2011).
- Period 87, to be used for Phase II preparation for observations in the P87 period (Apr.2011-Sep.2011).
- Period 88, to be used for Phase II preparation for observations in the P88 period (Oct.2011-Mar.2012).
- Period 89, to be used for Phase II preparation for observations in the P89 period (Apr.2012-Sep.2012).
- Period 90, to be used for Phase II preparation for observations in the P90 period (Oct.2012-Mar.2013).
- Period 91, to be used for Phase II preparation for observations in the P91 period (Apr.2013-Sep.2013).
- Period 92, to be used for Phase II preparation for observations in the P92 period (Oct.2013-Mar.2014).
- UVES Templates Reference Guide
Detailed information on the acquisition, observation and calibration templates.
- Period 85, to be used for Phase II preparation for observations in the P85 period (Apr.2010-Sep.2010).
- Period 86, to be used for Phase II preparation for observations in the P86 period (Oct.2010-Mar.2011).
- Period 87, to be used for Phase II preparation for observations in the P87 period (Apr.2011-Sep.2011).
- Period 88, to be used for Phase II preparation for observations in the P88 period (Oct.2011-Mar.2012).
- Period 89, to be used for Phase II preparation for observations in the P89 period (Apr.2012-Sep.2012).
- Period 90, to be used for Phase II preparation for observations in the P90 period (Oct.2012-Mar.2013).
- Period 91, to be used for Phase II preparation for observations in the P91 period (Apr.2013-Sep.2013).
- Period 92, to be used for Phase II preparation for observations in the P92 period (Oct.2013-Mar.2014).
- UVES Calibration Plan
Detailed information on the calibration plan of UVES observations.
- Period 85, to be used for Phase II preparation for observations in the P85 period (Apr.2010-Sep.2010).
- Period 86, to be used for Phase II preparation for observations in the P86 period (Oct.2010-Mar.2011).
- Period 87, to be used for Phase II preparation for observations in the P87 period (Apr.2011-Sep.2011).
- Period 88, to be used for Phase II preparation for observations in the P88 period (Oct.2011-Mar.2012).
- Period 89, to be used for Phase II preparation for observations in the P89 period (Apr.2012-Sep.2012).
- Period 90, to be used for Phase II preparation for observations in the P90 period (Oct.2012-Mar.2013).
- Period 91, to be used for Phase II preparation for observations in the P91 period (Apr.2013-Sep.2013).
- Period 92, to be used for Phase II preparation for observations in the P92 period (Oct.2013-Mar.2014).
- UVES Pipeline User Manual
Detailed information on how to reduce data obtained with UVES.- v2.9.7, to use the latest version of the MIDAS-based pipeline. A data reduction cookbook is available here.
- v4.9.5, to use the latest version of the CPL-based pipeline. Instructions to download and install the UVES CPL-based pipeline are available in the UVES section of the VLT Instrument Pipelines webpage.
